Flusshinweise
Als Grundlage dient wenn immer möglich ein Flussführer.

Donnersbach: Klamm
IV-V 0 km
Irdningbach @ Irdning 2.7 m³/s @ 16:30
5 | 7 .. 10 m³/s
Resultate 1 - 2 von 2
Bewertung NW-MW-HW
Correction of Highwater/Low-Water marks necessary.
I'd say 5m³/s is the minimum.
With 7m³/s it starts to be great fun, and can still be done even if you don't know the run.
With 10m³ it still feels like the river can take more water bit it starts to get fast.
I'd say 5m³/s is the minimum.
With 7m³/s it starts to be great fun, and can still be done even if you don't know the run.
With 10m³ it still feels like the river can take more water bit it starts to get fast.